synthetic replay · 30-min ticks
Workforce management · an estimator

Instability is a shape, not a headline number.

One incident day, plotted as the field. Required staff is the demand curve; effective staff is the schedule curve. Where the two pull apart — a demand surge at 13:00, a collapse at 15:30 — the gap is the instability. Drag shrinkage to see the field deform.

Coverage field · required vs effective FTEB14 · B19 · B16 · Wednesday (incident)
interval
--:--
B14 required
—
B19 effective
—
B16 net gap
—
+0%
B16

Net Staffing Gap

Staffing & Balance · L2
Claim · what WFM normally means

The difference between the staff the workload requires and the staff actually available, after shrinkage. Negative means over-staffed, positive means under-staffed.

Proof · what AVYR computes
net_gap = required_fte − (scheduled_fte × (1 − shrinkage))
The matrix · numbered metrics by family